I want to create a scene where I switch on a TH, in turn, it will switch on a 16A Power switch(Sonoff) but all in between 11 pm to 6 am. I am able to create the scene but without the timeline. Please help.
Sk Paul
I want to create a scene where I switch on a TH, in turn, it will switch on a 16A Power switch(Sonoff) but all in between 11 pm to 6 am. I am able to create the scene but without the timeline. Please help.
Thanks in advance